There were 16 lift shaft in central core. The casting of this core in conventional system was tedious and time consuming activity. This activity also dependent on tower crane availability. As floor to floor height was 4.2m casting of core in one pour was not possible in the conventional system. Looking at these construction challenges, Aluminium formwork system was designed for lift core. After using aluminium formwork system concreting in one pour was possible and also dependency of tower crane was eliminated. The approximately 1000 sqm formwork was used for lift core.

Related Posts

Testimonial-1

12 Sep 2020 22

Our Team

09 Sep 2020 23

12 thoughts on “Marathon Futurex, Lower Parel

  1. Thank you for the sensible critique. Me and my neighbor were just preparing to do a little research about this. We grabbed a book from our local library but I think I learned more from this post. I am very glad to see such excellent info being shared freely out there. Mabelle Anthony Aldarcy

  2. whoah this blog is magnificent i really like studying your posts. Keep up the great work! You understand, a lot of people are hunting around for this information, you could help them greatly. Shawn Hanan Corabelle

Leave a Reply

Your email address will not be published. Required fields are marked *

error: Content is protected !!